BMS Protection board tester semi-automatic
The semi-automatic testing platform is equipped with 1-6 PBTS/PBTS (M) protection board testers. Customers can replace the testing platform fixtures to achieve a single person board loading, start testing, automatically mark error points on the platform after testing is completed, and manually take and replace the board cycle testing process. It can easily achieve the effect of single person control of 20 protective board testers, saving labor and ensuring detection accuracy.
Ⅱ.Equipment parameter description